Abotaleb, I S and El-adaway, I H (2018) First Attempt Toward a Holistic Understanding of the Interdependent Rippled Impacts Associated with Out-of-Sequence Work in Construction Projects: System Dynamics Modeling Approach. Journal of Construction Engineering and Management, 144(09).

Al-Bayati, A J and Al-Zubaidi, H A (2018) Inventory of Nanomaterials in Construction Products for Safety and Health. Journal of Construction Engineering and Management, 144(09).

Chen, R, Tan, Y, Zhang, B, Shen, W, Liu, G and Wang, Z (2018) Installation of Integral Prefabricated Bridge Abutment and Pier with Flexible Water Stop Curtain. Journal of Construction Engineering and Management, 144(09).

Cheng, M, Huang, K and Hutomo, M (2018) Multiobjective Dynamic-Guiding PSO for Optimizing Work Shift Schedules. Journal of Construction Engineering and Management, 144(09).

Chennarapu, H, Garala, T K, Chennareddy, R, Balunaini, U and Venkata Narasimha Reddy, G (2018) Compaction Quality Control of Earth Fills Using Dynamic Cone Penetrometer. Journal of Construction Engineering and Management, 144(09).

Gerami Seresht, N and Fayek, A R (2018) Dynamic Modeling of Multifactor Construction Productivity for Equipment-Intensive Activities. Journal of Construction Engineering and Management, 144(09).

Ghoddousi, P, Nasirzadeh, F and Hashemi, H (2018) Evaluating Highway Construction Projects’ Sustainability Using a Multicriteria Group Decision-Making Model Based on Bootstrap Simulation. Journal of Construction Engineering and Management, 144(09).

Hosseini, M R, Martek, I, Papadonikolaki, E, Sheikhkhoshkar, M, Banihashemi, S and Arashpour, M (2018) Viability of the BIM Manager Enduring as a Distinct Role: Association Rule Mining of Job Advertisements. Journal of Construction Engineering and Management, 144(09).

Hu, C and Liu, D (2018) Improved Critical Path Method with Trapezoidal Fuzzy Activity Durations. Journal of Construction Engineering and Management, 144(09).

Lee, W and Migliaccio, G C (2018) Temporal Effect of Construction Workforce Physical Strain on Diminishing Marginal Productivity at the Task Level. Journal of Construction Engineering and Management, 144(09).

Meng, J, Yan, J and Xue, B (2018) Exploring Relationships between National Culture and Infrastructure Sustainability Using QCA. Journal of Construction Engineering and Management, 144(09).

Ong, H Y, Wang, C and Zainon, N (2018) Developing a Quality-Embedded EVM Tool to Facilitate the Iron Triangle in Architectural, Construction, and Engineering Practices. Journal of Construction Engineering and Management, 144(09).

  • Type: Journal Article
  • Keywords: Total quality variables; Iron triangle; Earned Value Management; Construction quality assessment system (CONQUAS);
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001533
  • Abstract:
    In modern architecture, engineering, and construction (AEC) practices, the Iron Triangle of schedule, cost, and quality remains the key measurement to gauge project success. Existing tools do not work well at monitoring all three measures of the Iron Triangle, resulting in a huge cost and time overrun, and the existing functionality of Earned Value Management (EVM) covers only time and cost, but not quality. Thus, this study aims to develop a quality extension to EVM that caters to quality measurement. Firstly, this research introduced a measurable index and developed a new quality assessment method named the Quality Performed Assessment Method (QPAM) through a quantitative approach. Subsequently, a new tool named Earned Quality Value Management (EQVM) was developed to manage the Iron Triangle in a single reporting setting. The QPAM and EQVM were validated through three tiers of validation processes, namely, a pilot run to test its functionality in a conceptual model, a scenario analysis to identify its sensitivity, and a real case study to validate its functionality. QPAM and EQVM performed satisfactorily in systematic reporting and monitoring enhancement. This single reporting tool enables project stakeholders to make cross-comparisons and gain more insight into the project portfolio. Academically, this research minimized the gap among Iron Triangle management, quality management, and project portfolio management. Practically, this research developed a method for Iron Triangle control on a daily basis for both a single project and a portfolio.

Oti, A H, Tah, J H M and Abanda, F H (2018) Integration of Lessons Learned Knowledge in Building Information Modeling. Journal of Construction Engineering and Management, 144(09).

Pereira, E, Hermann, U, Han, S and AbouRizk, S (2018) Case-Based Reasoning Approach for Assessing Safety Performance Using Safety-Related Measures. Journal of Construction Engineering and Management, 144(09).

Raoufi, M and Fayek, A R (2018) Framework for Identification of Factors Affecting Construction Crew Motivation and Performance. Journal of Construction Engineering and Management, 144(09).

Tang, Y, Wang, G, Li, H and Cao, D (2018) Dynamics of Collaborative Networks between Contractors and Subcontractors in the Construction Industry: Evidence from National Quality Award Projects in China. Journal of Construction Engineering and Management, 144(09).